No pre-adjustment
The integrated holding device adapts itself to any component thickness. No trial and error, no readjusting. With a hundred fixing points, that saves hours per site.
The clamp for net and guardrail posts – on steel, concrete and timber. No drilling, no welding, no time-consuming pre-adjustment.
Every second counts on site. is installed before other systems have even been adjusted.
arrives factory pre-assembled as a single unit. No bolt, no hole pattern, no size range – and nothing that has to be set beforehand.

Position the clamp on the component and slide it forward. It adjusts continuously and automatically to beams, columns or slabs.

Tighten one clamping screw to 130 Nm. On timber and concrete, no additional screw is needed.

Insert your scaffold tube (up to 51.9 mm) into the tube holder unit. Net, toe board and couplers as usual.

Place a flat-head screwdriver in the oval recess and remove . Then reset it to its as-delivered condition – ready for the next site.
Every step animated directly from the design data – just as it happens on site.
Choose a product to rotate it in 3D.
The integrated holding device adapts itself to any component thickness. No trial and error, no readjusting. With a hundred fixing points, that saves hours per site.
One product for steel beams, concrete columns and timber columns. Without drilling, without welding, without damage.
DEKRA-tested to DIN EN 13374 for both classes. One component instead of two systems.
Position, tighten, insert the post. No hammer, no special tools, no second person.
You use posts, nets, toe boards and couplers from your own stock. is the connection point.
After dismantling, reset it to its as-delivered condition and reuse it on the next site.

The key values at a glance. Full details are in the assembly and instructions for use.
| Testing | DEKRA, DIN EN 13374 Class A and B |
|---|---|
| Substrate | Steel beam, concrete column, timber column |
| Adjustment | continuous and automatic to the component thickness |
| Fixing | one clamping screw, 130 Nm |
| Post | Scaffold tube up to 51.9 mm, supplied on site |
| Installation height | 3 – 40 m |
| Roof pitch | up to 30° |
| Wind | Stop work from 10 m/s, dismantle from 28.0 m/s |
| Weight | approx. 9 kg |
| Delivery condition | factory pre-assembled |
Our own, legally protected innovation. Developed in Germany, produced in Kosovo to EU standards.
“We develop solutions that make construction processes simpler, safer and more cost-effective.”
“100% European production. Short lead times and maximum independence from global supply chains.”
We come to you – advice, no sales pressure.